Located off La. 82 on the Vermilion River between Abbeville and Intracoastal City, Palmetto Island State Park will be a full-fledged 1299-acre facility. Amenities at the site will include 6 two-bedroom cabins, campsites, 4 picnic pavilions and picnic sites, a water playground and floating pier.
Phases 1 and 2 -- foundation, road grading, infrastructure and utilities -- of the three-step construction process have been completed. Construction on Phase 3 (buildings and amenities) has begun, and should be complete by late 2009. This fiscal year's budget does not allow for the operation of Palmetto Island State Park, and anticipated to open during the 2010-2011 fiscal year. |
![]() Vermillion Parish and State Parks officials, along with architects and landscape developers, break ground for the Palmetto Island State Park on December 5, 2002.   |
![]() June 2009 -- Exterior work nearly finished on one of the vacation cabins. |
![]() The Entrance Station with completed siding. |
![]() Visitor Center, with the exterior nearing completion. |
![]() February 2009 -- The Visitor Center, now ready for siding and roofing. |
![]() Two of the vacation cabins. |
![]() The Entrance Station to the park, now with walls. |
![]() December 2008 -- The park's Entrance Station takes shape. |
![]() Framing of the Visitor Center is well underway. |
![]() October 2008 -- Pylons for the park's Visitor Center. |
![]() Pylons for one of the lakeside pavilions. |
![]() Flooring and the water pipes for the campground comfort station. |
![]() Framework for the park's entrance station. |
![]() October 2004 -- The two-land boat ramp at Palmetto Island State Park is completed. |
![]() Both fishers and visitors to the park will be able to enjoy the site's five-acre lagoon. |
![]() July 2004 -- Limestone is laid to prepare the roads and camping spurs at Palmetto Island State Park. |
![]() The park's entrance road and foundation of the entrance station. |
![]() April 2004 -- Ground is built up and leveled for construction of the boat dock. |
![]() The pedestrian bridge, leading from the boat dock to the cabins. |
![]() Sheet piles being driven into the river near the boat dock. | ![]() February 2004 -- Sheets of piling material, to be used in supporting the bank area around the boat launch. |
![]() Preparations to build a pedestrian bridge near the boat launch. |
![]() December 2003 -- Dirt removed to create a 7-acre lagoon is reused to build up the park's roads before paving. |
![]() May 2003 -- Clearing the main entrance road into Palmetto Island SP |
![]() One of the scenic man-made lakes that will be part of the canoe circuit. |
![]() January 2003 -- Preparing the site for construction work at Palmetto Island SP |
![]() |